Storage tanks being decommissioned following a lightning-strike fire at a natural gas site in Alabama.
Share
Alabama, USA
Three tanks damaged by adjacent fire
Four-day on-site response

A fire at a property adjacent to a customer site — most likely caused by a lightning strike — created an emergency that required immediate response. The thermal exposure caused one of the customer’s 1,000-gallon odorant storage tanks to BLEVE (boiling liquid expanding vapor explosion), opening an 8-inch gash in the tank wall. A second 1,000-gallon tank, partially shielded from the first tank’s failure, sustained damage to a pipe on its vapor side and retained approximately 150 gallons of odorant in compromised condition. A 150-gallon day tank in the same system was charred by the fire but did not ignite.

The customer needed a response capable of stabilizing three damaged tanks, recovering the residual odorant safely, decommissioning the equipment for removal, and producing the documentation required for the insurance and regulatory follow-up that an incident of this severity generates. The response needed to be fast, technically rigorous, and disciplined enough to avoid making a bad situation worse.

Approach

MRR mobilized to the site within the response timeline required for the incident. The work proceeded in a deliberate sequence that prioritized stabilization before any equipment movement.

The first action was sealing the 8-inch breach in the ruptured 1,000-gallon tank to prevent any continued release of residual material. With the breach sealed and atmospheric conditions stabilized, the second 1,000-gallon tank was sealed at the damaged pipe connection, drained of its remaining 150 gallons of odorant, and prepared for decommissioning. The charred day tank was drained and decommissioned in parallel.

The full odorizer assembly — pump, panel, associated piping and tubing — was decommissioned and removed. The total recovered odorant, approximately 220 gallons, was transferred into appropriate containers for transport to incineration rather than reuse, given the unknown contamination state of material that had been through a fire event.

Site documentation captured the condition of each tank on MRR's arrival, the response sequence, the volumes recovered, the chain of custody for the recovered material, and the final disposition of each component of the damaged equipment.

Outcome

The full response — sealing, draining, decommissioning, equipment removal, and material disposition — was completed in four days on site. The damaged equipment left the site under proper hazardous materials documentation and was destroyed under controlled conditions. The customer received a complete incident response file covering the equipment condition, the response actions taken, and the final disposition of all material.

The customer’s insurance and regulatory follow-up proceeded on the foundation of a documented response performed by a contractor specialized in the substance involved. The site was returned in a condition that supported the rebuild work that followed.

MRR maintains 24-hour emergency response capability across North America. The work is not the bulk of what we do, but it is the work that defines what kind of partner we are. The Alabama call came in, and we were on site.

Upward view of a modern high-rise apartment tower in Manhattan with reflective glass windows and protruding balconies against a blue sky.
Manhattan Odor Fade Resolution

Odor fade in the new gas piping of a Manhattan high-rise, eliminated in two weeks with no odorant intentionally released to the neighborhood.

MRR enclosure tent reading "Your End-to-End Gas Odorization Partner," connected to hoses and blower equipment for an atmospheric-isolated soil excavation, with safety cones in the foreground.
Large Mercaptan Spill Remediated

More than 400 odor calls, seven figures a day in potential lost revenue, and mercaptan underground beside active waterways.

Small tan modular gas odorization building connected to storage tanks and piping at a rural renewable natural gas site, with utility poles in the background.
RNG Building, 3-Month Commission

A modular RNG odorization building, manufactured off-site and commissioned at a Quebec injection point on a three-month schedule.

Technician in blue coveralls with reflective safety striping adjusting a temporary gas odorization skid and tank at a fenced outdoor site.
Emergency Temporary Odorization

Maintaining odorization compliance for three months while a failed permanent system was redesigned, fabricated, and installed.

Refinery storage tank being decommissioned at an industrial site in Illinois.
5,000-Gallon Tank Decommissioning

Replacing a 5,000-gallon ethyl mercaptan tank at a refinery, with 1,800 gallons of odorant held and returned to service.

On-site incineration equipment used to drain and treat over-odorized liquid from a 12-inch transmission line in Quebec
12-Inch Odorant Drain and Incineration

Excavating, tapping, and draining liquid odorant from a 12-inch transmission line — two-week response with on-site incineration.

C1D1-rated dual-odorizer trailer, a custom-built mobile gas odorization unit, at an industrial site in Illinois.
C1D1 Dual-Odorizer Trailer

A dual-odorizer trailer with integrated filtration, flow telemetry, and C1D1-rated systems — 20 weeks from order to delivery.

Row of portable flare units operating at night to generate flow for an inline pipeline inspection campaign in northern Ontario
Six-Week Flow Generation

Portable flow generation supporting an inline inspection campaign in northern Ontario — 12 to 16 hours a day across six weeks.

Natural gas pipeline conditioning equipment at a shopping mall construction site in New Jersey.
New Jersey Mall Gas Line Conditioning

Conditioning new gas lines inside a mall under construction — with continuous monitoring that surfaced previously undetected leaks.

1,000-gallon modular gas odorization building installed at a site in Georgia.
1,000-Gallon Modular Building

A 1,000-gallon modular odorization building, fabricated at the MRR shop and set on its foundation as a single integrated unit.

Natural gas odorization equipment being decommissioned across four stations at a site in Nebraska.
Four-Station Retirement, 2,300 Gal.

Retiring odorization infrastructure across four stations, recovering 2,300 gallons of odorant for continued service.

Storage tanks being decommissioned following a lightning-strike fire at a natural gas site in Alabama.
Three-Tank Decommissioning

Stabilizing and decommissioning three tanks damaged in a suspected lightning-strike fire, four days from mobilization to closure.

Renewable natural gas odorization system engineered and commissioned at a site in Ontario.
5-Month RNG Commission

Custom design, manufacturing, and commissioning of a renewable natural gas odorization system, delivered in five months end to end.

1980s-era underground storage tank being cut down and removed at a site in Michigan.
1980s Tank Removal

Removing a 1980s-era underground bulk odorant tank too large to transport — treated and cut down for removal entirely on site.

36-inch natural gas transmission line during a pipeline pickling operation at a site in Texas.
36-Inch, 10-Week Pickling at 850 psig

Conditioning a new 36-inch, 64-mile transmission pipeline over 10 weeks of continuous online pickling at 850 psig.