Share
Michigan, USA
2,500-gallon underground bulk tank from the 1980s
On-site treatment

A Michigan natural gas utility was upgrading a gate station that had been in service since the early 1980s. The existing odorization infrastructure included a 2,500-gallon underground bulk odorant storage tank, 26 inches in diameter and 90 feet long, along with a 165-gallon vertical day tank, an associated flare, an odorant pump, and roughly 1,000 feet of odorant-contaminated piping running both above and below grade.

The underground tank had been buried for four decades. Its interior surfaces carried decades of absorbed mercaptan that would continue to off-gas for years if the tank were moved without proper treatment. Standard practice would be to remove the tank to MRR’s processing facility in West Virginia for off-site treatment — but at 90 feet long, the tank was beyond what could be transported in one piece. The project required a different approach.

Approach

MRR designed a fully on-site treatment operation. The work sequence had to accomplish several objectives simultaneously: relocate the residual odorant from the existing system to an alternate utility station so it could continue in productive use, isolate and remove the contaminated piping network without releasing odorant into the surrounding environment, excavate and de-odorize the 90-foot tank in place, and prepare the site for the operator’s new equipment installation.

The residual odorant — approximately 215 gallons — was filtered and transferred from the existing tank to an MRR bobtail truck for relocation to a designated utility station. The 1,000 feet of contaminated piping, both above and below grade, was identified, isolated, and removed in segments. The flare and odorant pump were decommissioned and removed in parallel.

The 90-foot tank itself was excavated to expose the full length, then treated on site using MRR's on-site de-odorization process. The process reduced absorbed mercaptan in the tank interior to a level below detection thresholds, allowing the tank to be cut into transportable sections for removal to recycling. No portion of the tank left the site carrying the absorbed odorant reservoir that would have caused community odor complaints during transport.

Outcome

The full project — odorant relocation, piping removal, tank excavation, on-site treatment, cutting, and final removal — was completed in two weeks. The 215 gallons of residual odorant continued in productive use at the alternate station. The treated steel from the tank entered the standard recycling stream. The site was returned to the operator clean and ready for new equipment installation.

The operator received a complete documentation package covering the regulatory notifications, the chain of custody for all removed material, the on-site treatment record, and the final disposition certifications for both the treated steel and the contaminated piping. The closure file is what the operator’s compliance team will reference for any future audit, acquisition due diligence, or environmental review of the site.

Most decommissioned equipment leaves MRR customer sites under hazmat manifest, bound for treatment at the Philippi plant in West Virginia. The Michigan tank stayed in Michigan because it had to. On-site treatment is the path when transport is not.

Upward view of a modern high-rise apartment tower in Manhattan with reflective glass windows and protruding balconies against a blue sky.
Manhattan Odor Fade Resolution

Odor fade in the new gas piping of a Manhattan high-rise, eliminated in two weeks with no odorant intentionally released to the neighborhood.

MRR enclosure tent reading "Your End-to-End Gas Odorization Partner," connected to hoses and blower equipment for an atmospheric-isolated soil excavation, with safety cones in the foreground.
Large Mercaptan Spill Remediated

More than 400 odor calls, seven figures a day in potential lost revenue, and mercaptan underground beside active waterways.

Small tan modular gas odorization building connected to storage tanks and piping at a rural renewable natural gas site, with utility poles in the background.
RNG Building, 3-Month Commission

A modular RNG odorization building, manufactured off-site and commissioned at a Quebec injection point on a three-month schedule.

Technician in blue coveralls with reflective safety striping adjusting a temporary gas odorization skid and tank at a fenced outdoor site.
Emergency Temporary Odorization

Maintaining odorization compliance for three months while a failed permanent system was redesigned, fabricated, and installed.

Refinery storage tank being decommissioned at an industrial site in Illinois.
5,000-Gallon Tank Decommissioning

Replacing a 5,000-gallon ethyl mercaptan tank at a refinery, with 1,800 gallons of odorant held and returned to service.

On-site incineration equipment used to drain and treat over-odorized liquid from a 12-inch transmission line in Quebec
12-Inch Odorant Drain and Incineration

Excavating, tapping, and draining liquid odorant from a 12-inch transmission line — two-week response with on-site incineration.

C1D1-rated dual-odorizer trailer, a custom-built mobile gas odorization unit, at an industrial site in Illinois.
C1D1 Dual-Odorizer Trailer

A dual-odorizer trailer with integrated filtration, flow telemetry, and C1D1-rated systems — 20 weeks from order to delivery.

Row of portable flare units operating at night to generate flow for an inline pipeline inspection campaign in northern Ontario
Six-Week Flow Generation

Portable flow generation supporting an inline inspection campaign in northern Ontario — 12 to 16 hours a day across six weeks.

Natural gas pipeline conditioning equipment at a shopping mall construction site in New Jersey.
New Jersey Mall Gas Line Conditioning

Conditioning new gas lines inside a mall under construction — with continuous monitoring that surfaced previously undetected leaks.

1,000-gallon modular gas odorization building installed at a site in Georgia.
1,000-Gallon Modular Building

A 1,000-gallon modular odorization building, fabricated at the MRR shop and set on its foundation as a single integrated unit.

Natural gas odorization equipment being decommissioned across four stations at a site in Nebraska.
Four-Station Retirement, 2,300 Gal.

Retiring odorization infrastructure across four stations, recovering 2,300 gallons of odorant for continued service.

Storage tanks being decommissioned following a lightning-strike fire at a natural gas site in Alabama.
Three-Tank Decommissioning

Stabilizing and decommissioning three tanks damaged in a suspected lightning-strike fire, four days from mobilization to closure.

Renewable natural gas odorization system engineered and commissioned at a site in Ontario.
5-Month RNG Commission

Custom design, manufacturing, and commissioning of a renewable natural gas odorization system, delivered in five months end to end.

1980s-era underground storage tank being cut down and removed at a site in Michigan.
1980s Tank Removal

Removing a 1980s-era underground bulk odorant tank too large to transport — treated and cut down for removal entirely on site.

36-inch natural gas transmission line during a pipeline pickling operation at a site in Texas.
36-Inch, 10-Week Pickling at 850 psig

Conditioning a new 36-inch, 64-mile transmission pipeline over 10 weeks of continuous online pickling at 850 psig.