Client Success Stories

Natural gas pipeline conditioning equipment at a shopping mall construction site in New Jersey.
New Jersey Mall Gas Line Conditioning
Conditioning new gas lines inside a mall under construction — with continuous monitoring that surfaced previously undetected leaks.
Refinery storage tank being decommissioned at an industrial site in Illinois.
5,000-Gallon Tank Decommissioning
Replacing a 5,000-gallon ethyl mercaptan tank at a refinery, with 1,800 gallons of odorant held and returned to service.
1,000-gallon modular gas odorization building installed at a site in Georgia.
1,000-Gallon Modular Building
A 1,000-gallon modular odorization building, fabricated at the MRR shop and set on its foundation as a single integrated unit.
1980s-era underground storage tank being cut down and removed at a site in Michigan.
1980s Tank Removal
Removing a 1980s-era underground bulk odorant tank too large to transport — treated and cut down for removal entirely on site.
Technician in blue coveralls with reflective safety striping adjusting a temporary gas odorization skid and tank at a fenced outdoor site.
Emergency Temporary Odorization
Maintaining odorization compliance for three months while a failed permanent system was redesigned, fabricated, and installed.
Storage tanks being decommissioned following a lightning-strike fire at a natural gas site in Alabama.
Three-Tank Decommissioning
Stabilizing and decommissioning three tanks damaged in a suspected lightning-strike fire, four days from mobilization to closure.
Renewable natural gas odorization system engineered and commissioned at a site in Ontario.
5-Month RNG Commission
Custom design, manufacturing, and commissioning of a renewable natural gas odorization system, delivered in five months end to end.
Small tan modular gas odorization building connected to storage tanks and piping at a rural renewable natural gas site, with utility poles in the background.
RNG Building, 3-Month Commission
A modular RNG odorization building, manufactured off-site and commissioned at a Quebec injection point on a three-month schedule.
On-site incineration equipment used to drain and treat over-odorized liquid from a 12-inch transmission line in Quebec
12-Inch Odorant Drain and Incineration
Excavating, tapping, and draining liquid odorant from a 12-inch transmission line — two-week response with on-site incineration.
C1D1-rated dual-odorizer trailer, a custom-built mobile gas odorization unit, at an industrial site in Illinois.
C1D1 Dual-Odorizer Trailer
A dual-odorizer trailer with integrated filtration, flow telemetry, and C1D1-rated systems — 20 weeks from order to delivery.
MRR enclosure tent reading "Your End-to-End Gas Odorization Partner," connected to hoses and blower equipment for an atmospheric-isolated soil excavation, with safety cones in the foreground.
Large Mercaptan Spill Remediated
More than 400 odor calls, seven figures a day in potential lost revenue, and mercaptan underground beside active waterways.
Row of portable flare units operating at night to generate flow for an inline pipeline inspection campaign in northern Ontario
Six-Week Flow Generation
Portable flow generation supporting an inline inspection campaign in northern Ontario — 12 to 16 hours a day across six weeks.
Upward view of a modern high-rise apartment tower in Manhattan with reflective glass windows and protruding balconies against a blue sky.
Manhattan Odor Fade Resolution
Odor fade in the new gas piping of a Manhattan high-rise, eliminated in two weeks with no odorant intentionally released to the neighborhood.
Natural gas odorization equipment being decommissioned across four stations at a site in Nebraska.
Four-Station Retirement, 2,300 Gal.
Retiring odorization infrastructure across four stations, recovering 2,300 gallons of odorant for continued service.
36-inch natural gas transmission line during a pipeline pickling operation at a site in Texas.
36-Inch, 10-Week Pickling at 850 psig
Conditioning a new 36-inch, 64-mile transmission pipeline over 10 weeks of continuous online pickling at 850 psig.

Brochures

Odorant Delivery & Transfer
July 2026
PDF
47.1 KB
Odor Control Products
July 2026
PDF
71.6 KB
Engineered Products
July 2026
PDF
44.8 KB
Decommissioning
July 2026
PDF
59.2 KB
Pipeline Conditioning
July 2026
PDF
66 KB
Emergency Spill Response
August 2026
PDF
77 KB
Training & Operational Preparedness
August 2026
PDF
77 KB
Odor Detectability for Critical Facilities
August 2026
PDF
70 KB
Temporary Odorization & Equipment Rentals
August 2026
PDF
67 KB
Compliance & Validation
August 2026
PDF
62 KB
Portable Flow Generation & Incineration
August 2026
PDF
62 KB
Odorization Buildings
August 2026
PDF
56 KB
Odorization Training Trailers
August 2026
PDF
53 KB
Odorant Delivery Trucks
August 2026
PDF
60 KB
Innovation
August 2026
PDF
63 KB
NeLo™
August 2026
PDF
59 KB

Spec Sheets

Watchtower™
July 2026
PDF
37 KB
MRR Ballem Float Level Gauge
August 2026
PDF
38.8 KB
Odorization Trailers
July 2026
PDF
60.7 KB
MRR Bypass Odorizers
August 2026
PDF
54.4 KB
Mercaptan Spill Kits
August 2026
PDF
40.4 KB
MRR Flow Meter Tracker
August 2026
PDF
39.7 KB
MRR Integrated Odorizer
August 2026
PDF
41.9 KB
Odorant Drying with Arida™
July 2026
PDF
55.8 KB
MRR OdorTracker™
September 2026
PDF
53.3 KB
EZ Carb™ Activated Carbon Filters
July 2026
PDF
60.0 KB
MRR Low Volume RNG Odorization Skids
July 2026
PDF
54.4 KB
Mask-O SDS Sheet
January 2025
PDF
471 KB
DEOmer SDS Sheet
September 2025
PDF
470 KB

Media

Videos
No items found.
Photos
No items found.

Not Seeing What You’re Looking For?