Permanent Installation of an Odorization System

MRR was contracted to decommission obsolete Pulsafeeder odorization system and replace it with a NJEX system. MRR decommissioned the old 1000 gallon tank, installed the new 1000 gallon tank and odorant skid, start-up the system and trained local technicians on operation.

LOCATION

what we did

New Odorization System